Home arrow Pictures & Media arrow Field Site Pictures

Home
Project & People
Research
Training
Pictures & Media
Login
Field Site Pictures PDF Print E-mail
Pictures from the Dan Phuong Field Site
 
 Preparing for riverbed flux measurements
 

 Approximately 30 of the 100 piezometerwells for groundwater sampling installed in the first transect

 
 Getting the flow cell ready
 
 Almost there - just need to calibrate
 
 Alkalinity titration and spectrophotometric measurements in the field laboratory 
 
 Calibrating the pH meter in the Field Laboratory tent
 
 Leveling the new transect
 
 Preparing for pump test
 
 Sampling water from the small channel on the south side of the field site

 
 Cows swimming accross the tributary channel north of the field site

 

DTU Environment | 2800 Lyngby | Tlf. 45 25 16 00 | CVR-nr. 30 06 09 46 | EAN-nr. 5798000431201